Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

The flow chart in the Flow Chart step traces out all paths from the pit to product. This may include post-crusher conveying, processing, stacking, reclaiming, and railing if required.

...

Arrow Type

Arrow Colour

Comment

Destination Rule

Grey

Automatically added to the flow chart, based on the Destination Rules

Flow Rule

Black

Manually drawn on the flow chart by the user

...

Plant components can be added to Flow Rules by selecting the appropriate arrow, right-clicking and choosing “Select Applicable Plant Components” option. This will allow the assigned plant component to be used within the Flow Optimisation step to model bottlenecks or targets.

...

Раздел документации на русском языке 🇷🇺