Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Transactions performed by the PlantAgent are controlled by the optimization rules in the Calendar (optional). Otherwise. This sort of control is optional. If not controlled in the Calendar, it will default to the upstream or downstream site items rates.

...

Be carefull when setting PlantAgent maximum rate, if it’s set

Filter by the “PlantAgent” Agent in the Pivot report to see all material movements it controls:

...