Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

RU 🇷🇺

...

All benches in Rapid Reserver are cut from a master solid. These can be imported as existing solid files or created in the Solid Lab tab.

...

Icons

Symbol

Description

Blue Plus

Create a new blank Operation Set. All operations must be individually added.

Double Page

Copy an existing Operation Set including all existing operations. If the same operations are being used to create a phase, swap out the required files.

Red X

Remove highlighted Operation Set.

Up / Down arrows

Reorder Operation Set by moving highlighted set up/down the list.

Tip

All icons have tools tips.

...