Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

RU 🇷🇺

...

Table of Contents

Overview

...

  • Any intersecting volume is "Cut in Plan".

  • Any production volume outside the schedule boundary is "Cut Out of Plan".

  • Any schedule volume outside the production boundary is " Not Cut".

  • Any production volume above or below a schedule solid is "Cut Late" or "Over Cut".

  • Any schedule volume above or below a production solid is "Cut Early" or "Under Cut".

Domain Configuration

Different organizations may choose to report these domains with different names or combine them. This can be achieved by editing the domains “Reporting Name”. Other domain settings are located in the table directly below.

...