New option for Electric trucks to define Pathfinding for Chargers. Cycle times are adjusted to take into account the time and energy required to travel to and from charger.

Warnings are provided if the selected truck does not have a valid Fuel or Battery Usage curve setup. This will not impact the outcome of the schedule, but will cause power and fuel requirements to be incorrect.

...

  1. Standard mode - Used during construction and editing of a model.

  2. Join Interaction mode - Used to validate and modify block connections to the haul network.

  3. Schedule Audit mode - Used in conjunction with Schedule Auditor tab to review scheduled movements.

...

Left hand panel functionality remains unchanged. Provides functionality for selecting visibility at a more granular level.

Update right Right hand display panel provides global visibility settings.

...

Original Properties & Grid tabs have been removed and replaced with a new and improved version. This provides users the ability to bulk update selected items using the left most column, or update them individually.

...

Road signs have been moved from the right panel to the top tool bar along with other construction tools.

Functionality has also been updated to allow users to select a sign and plan as many times as they like before exiting ‘Sign Mode’. Signs panel is still able to be expanded and docked in another panel for convenience.

Right-Clicking on a sign now provides users with a simple way to remove signs.

...

Flags

Folders have been added to allow improved organisation. Folders are supported in the Properties Panel in Haul Infinity and in Dynamic Haulage within the Schedulers.

...

Custom properties have been expanded to include segments, this provides users with another way to tag roads.

Charger Nodes

Network points can now be upgraded to be Chargers in the same way as stockpiles and crushers.

...

Cycle time and power usage are automatically adjusted to account for the extra travel required to get to chargers.

...

Production Scheduler

Scripting Interface for Stockpiles Step

...

Ability to publish reports direct to PowerPoint

...

Tactical Scheduler

Battery Fleets -

Jira Legacy
serverSystem JIRA
serverIda1504521-c536-3723-adb2-41ad3eeaf15a
keyRSE-1938

Chargers added to HI to account for travel time and power usage when heading to chargers.

Chargers

Power usage for Chargers is reported in Schedule Calendar.

...