Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

A new type of Gantt report can now be created on the Reporting tab of ATS and APS. These Gantt reports are fully customisable and are designed to be printed. See /wiki/spaces/221/pages/30411613 for more information on how to create and configure these reports. With the release of this new function, the Tasks tab in APS has been made redundant and has been removed from the schedule tab. If required, the Tasks tab can be added back in by enabling the ‘Display Old Task Tab’ in the Final Configuration step.

...

Period Plot Reports

The functionality to create plots in RR and period plots in APS and ATS has been moved into the Reports tab for each product. The Plot tab in RR, Period Plot tab in ATS, and Period Plot tab in APS is therefore no longer present. In addition, there are more options in the configuration of these plots, including the ability to only show benches that have been scheduled, and the ability to view the benches in a list form rather than a tree form.

...