Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

When reviewing the Dependency and Trace dialog for a record, the information shown will now update based on the position of the period slider.

...

...

Production Scheduler

Secondary Periods

Due to APS being based on instantaneous time, it is now possible to define multiple Period Sets, all of which can be reported against. One period set must be enabled as the ‘Primary' set, which will define the intervals for calendar based inputs. Secondary Period Sets can be helpful when finer granularity is required for reporting, but the calendar inputs don’t necessarily change at the same frequency. An example would be a two-week plan where the calendar inputs are provided at weekly intervals, but production requires shiftly reports.

1. Set up a Period Set with weekly intervals and set this as the Primary set.

...

2. Set up a secondary Period Set with Shiftly Intervals.

...

3. The required Period Set can be chosen for the focused report by selecting it from the drop-down menu after pressing the calendar icon in the top toolbar. The data displayed in the report will be updated based on which set is currently active.

...

Split Destinations - JiT Destinations

...