Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

It is now possible to explicitly define which parcels Agents are allowed to perform activities on in the new ‘Agents ‘Agent Parcels’ step. The mutex group assigned to each activity in the ‘Agent Rates ‘Rates and Precedence' step will dictate what parcel groups are shown for each activity. For each Agent, the applicable parcel groupings can be enabled which will then flow through into the calendar where rates can be specified.

...

Configuration Option

Description

No Override

Apply no destination override; this is the default optionsetting.

None

If the record has an imported destination, choosing 'None’ will override the imported destination to have no override.

Destination(s)

Allows override destination(s) to be selected along with the corresponding ratios.

...

Setting

Description

Method

Never - No cascading will be performed.

WhenRequired - Cascading will only be performed where required (once there is not enough room in a lane above, it will that lane instead of show in the lane below).

Always - Cascading will always be performed (and will wrap around to the top row once the maximum number of lanes has been used).

Lanes

The maximum number of lanes that can be used for cascading.

...