Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

When reviewing the Dependency and Trace dialog for a record, the information shown will now update based on the position of the period slider.

...

Destination/Steps Logic - Search and Replace

It is now possible to perform Search and Replace operation on the text within the Destination and Steps logic rules. When selected, a dialog will be shown where a ‘Target Column’ can be selected, along with the text replacenment inputs.

...

...

Production Scheduler

Secondary Periods

...

3. The required Period Set can be chosen for the focused report by selecting it from the drop-down menu after pressing the calendar icon in the top toolbar. The data displayed in the report will be updated based on which set is currently active.

...

Agent Parcels

It is now possible to explicitly define which parcels Agents are allowed to perform activities on in the new ‘Agents Parcels’ step. The mutex group assigned to each activity in the ‘Agent Rates and Precedence' step will dictate what parcel groups are shown for each activity. For each Agent, the applicable parcel groupings can be enabled which will then flow through into the calendar where rates can be specified.

...

Split Destinations - JiT Destinations

...