Rotated option in Chrono Charts Setup
...
Rotated Chrono Chart
Animation - Export Updated dialog
In both Alastri Production Scheduler and Alastri Tactical Scheduler, the settings dialog that appears when exporting “Export Polygons for All Periods” or “Export Period Solids” has been updated.
The dialog now gives the users the following options:
File Type
Export Type - SinglePeriod or Cumulative
Method - Separate or Merged
Include Period Name
The dialog also gives a short explanation of what will be exported based on the users selection combination
...
Export Period Solids
...
Export Period Polygons
General
Settings and Most Recently Used projects now persist between versions.
...
Layers
Fixed a crash occurring when using bulk export when exporting to a zip file that is open.
Fixed an issue where "Create Final Surface" Tool on the layers panel was not working for a specific file.
Animation
Fixed various issues occurring in both Alastri Production Scheduler and Alastri Tactical Schedulerwith "Export Period Solids", "Export Polygons for All Periods" and "Export Stage Plan" functionality in Animation. Fixes include:
Some exported polygons were not being fully closed
Some solid dumps were missing from export
Cumulative export was not matching for separate and merged export types
Obscure objects were being included in export when using "Precision" setting
Issues around types of files that were being exported with respect to blasts and digs
Issues with some filenames being out of sequence
Dump files being created when they were not expected
...
Alastri Production Scheduler 21.1.x
...
Reporting - Copy Chrono Image
It is now possible to copy an image from a Chrono chart.
...
Chrono Copy Image
Animation - Export Updated dialog
...
The settings dialog that appears when exporting “Export Polygons for All Periods” or “Export Period Solids” has been updated.
The dialog now gives the users the following options:
...
...
Export Type - SinglePeriod or Cumulative
...
Method - Separate or Merged
...
Include Period Name
...
The dialog also gives a short explanation of what will be exported based on the users selection combination
...
Export Period Solids
...
Export Period Polygons
Gantt - Force Destinations
When a forced destination is applied, that destination will be preferred. If the forced destination is not available for any reason, then the schedule will fall back to the ordinary destination logic.
Items in the Gantt for forced destination will now appear with success or fail hatchings.
...
Schedule
Fixed a crash that would occur when running the schedule after scheduling Production and Presplit drilling for the same agent.
Fixed various exceptions occurring when running schedule for specific setups.
Setup
Fixed an issue where "Preferred Build Order" settings in the Stockpile Build Settings setup task were not being honoured.
Fixed an issue where the “Dependency Type” option would appear when it shouldn't after clearing manual dependencies on a bench in the On Bench setup task.
Reporting
Fixed an issue where Chrono setup would be left in a broken formatted state after using undo and redo for a certain sequence of steps.
Animation
Fixed an issue where Presplit animation was not showing correctly in some cases.
Fixed an issue where a point solid was showing at the beginning of a schedule when it contained no volume, in certain cases.
Fixed an issue where Animation “Display Settings” did not allow mass visibility toggle after reset.
Fixed various issues with "Export Period Solids", "Export Polygons for All Periods" and "Export Stage Plan" functionality in Animation. Fixes include:
Some exported polygons were not being fully closed
Some solid dumps were missing from export
Cumulative export was not matching for separate and merged export types
Obscure objects were being included in export when using "Precision" settingIssues around types of files that were being exported with respect to blasts and digs
Issues with some filenames being out of sequence
Dump files being created when they were not expected
Period Plots
Fixed an issue where user created Labels were not immediately appearing in Period Plots.
...
...
Alastri Tactical Scheduler 21.1.x
...
Bug Fixes
Reporting
Fixed an issue where “Find and Replace” was taking too long for Chrono reports.
Spatial Conformetrics 21.1.x
No specific changes for this release
...
Rapid Reserver 21.1.x
No specific changes for this release
...