Assigning joins based on segment names reduces the number of ramps available out of a pit. This increases scheduling speed and keeps trucks on the right ramps for that work area.
Table of Contents |
---|
...
Assigning the segments
Locate a pit or block with incorrect ramp connections.
Copy the ramp address (ie. OpenPit\Mine1\Pit2\Stage1) to clipboard.
Locate the ramp that should be used to exit the stage. If the ramp does not exist, draw it.
Select the ramp.
In the Properties panel, paste the block address into the "ramp name".
Select Extensions > Assign Joins Based On Segments Names.
Repeat the procedure from Step 1 until no blocks remain.
...
Info |
---|
Joins assigned using segment names persists between planning cycles, even if you change the scheduling blocks, because the segment properties have not changed. This makes it preferable to manual joins, since manual joins are flushed whenever the blocks are re-imported. |