...
It is possible to import multiple block models using CSV, Vulcan, Bintab or , MineSight, Surpac and Micromine files.
Real-Time Reserving
...
Export conformance surfaces, solids and reserves to “.dxf”, “.00t”, “.csv”, “.obj” and “.obj”tridb”.
Terminology
Mining Terms
Block model | Reserves file |
---|---|
Parcel | Classification of materials in the reserves file |
Conformance horizon | 3D surface representing Schedule Start, Schedule End, Survey Start, or Survey End. Used for determining conformant volumes |
Conformance domain | 3D volume representing Mined Early, Mined Late, Mined in Plan, Mined Outside Plan, and Not Mined conformance types |
Scheduling blocks | 3D solids used for scheduling cut and fill in mining operations |
Solid | 3D closed triangulation |
Stage Plan | The expected topography at a point in time in the schedule |
Surface | 3D triangulation without overlaps |
...