To prevent offsetting or loss of assigned joins with the haul network (that may occur when re-importing updated blocks), you can export the preassigned joins from the project and re-import them back after you make changes in the scheduler.

...

  1. Go to the Network tab.

  2. Open the Blocks tab (at the left bottom).

  3. Locate Import/Export Joins button, as shown below.

  4. Select “Export Joints” option.

  5. In the Save As window specify a relevant path relevant.

  6. Block Joins File will be saved in “.blockJoins” format.

...