The Schedule Auditor is a tool provided expressly for mine schedulers, to generate bulk haulage calculations across an entire schedule. To use this feature, you must supply an existing schedule that specifies sources, destinations, loaders, trucks and materials moved. Haul Infinity will then generate the full cycle time breakdown and 3D haul strings for each schedule record. This can be used to estimate truck fleet mobilisation and utilisation over time.
Table of Contents |
---|
Info |
---|
The schedule auditor requires a schedule to be imported. If you require scheduling assistance, ask us about the Alastri Tactical Scheduler. |
...
10. Click FINISH when the import is complete.
Info |
---|
The Sources and Destinations must exactly match between the Schedule and the Haul Infinity project. This means that for every source or destination in the schedule, there must be a node or a block that has that name. Moreover, if the schedule specifies a haul from source A to destination B, then there must a physical path on the network for a truck to travel between A and B. |
Schedule Import from Scheduler
...
In Alastri Tactical Scheduler:
Run all the Setup Tasks.
In the Schedule tab, run Scenario or Full Schedule.
In Haul Infinity:
In the top tab bar locate the Scheduler tab.
Select “Import from Scheduler”. Imported strings will be displayed as a list in the Scheduler Auditor tab.
Double click any line in the list to animate the haul in the viewport.
...
Schedule Audit
Double click the first line in the schedule auditor to activate the haul in the viewport. We can use the arrow keys to move forward and backward through the schedule; this lets us inspect the haulage solutions provided by Haul Infinity and make any functional changes to the network as required.
...
We may at any time switch to the Charts, Truck Times and Cycle Time Analysis tabs for more detail on the active haul.
...