...
Press the blue plus button located in the toolbar of the Polygons Surface Sets panel.
Give the surface set a meaningful name, i.e., "Pit1/Stage1".
Provide the relevant surfaces by dragging the surface from the layers Layers panel or loading it in via file by clicking on the black downwards pointing arrow at the end of the cell.
A description of the surfaces that can be loaded is shown in the table below.
Production Surfaces | |
---|---|
Production Start | Survey surface from the opening date |
Production End | Survey surface from the closing date |
Schedule Surfaces | |
Schedule Start | Plan depletion surface from the opening date |
Schedule End | Plan depletion surface from the closing date |
Schedule Future | (Optional) Plan depletion surface for the next period |
...