The Calendar Switches step allows the schedule to switch to a different set of operating conditions and rulesets. This can be used, for example, to switch between Day and Night shift, Hot and Cold seasons, Dry and Wet processing, Premium and Regular stockpile builds, and so on.
Calendar switches can be referenced in the Work Restrictions, Destination Rules, and Flow Chart steps.
To add a Calendar Switch:
In the Calendar Switch panel, press the blue plus button to add a new calendar switch.
Rename the new calendar switch to the desired name.
In the Options panel, press the blue plus button to add a new option.
Rename the new option to the desired name.
Add in all required options which exist for the calendar switch.
Info |
---|
The order in which the options are listed does not affect anything and can be changed using Up and Down arrows buttons. |