Enter the The Calendar tab consists of two main parts: Dashboard and Calendar itself.

Table of Contents
minLevel1
maxLevel7

Dashboard

Dashboards allow a user to create custom Calendar layouts. This can be used to organise rows into a concise summary of equipment used, tonnes moved, and grades achieved. More details see here.

Calendar Inputs

Input the necessary planning parameters, such as crusher rates, dig rates, truck numbers, and product grades for the schedule.

Switches

Enter the switch values by period.

Info

Switches may be used to change destinations and material flow over time. For more information, see PS. Calendar Switches, PS. Destination Rules, PS. Flow ChartChats sections.

...

Ratios

Enter ratio values by period.

Info

Ratios may be used to control percentages of product type created in each period. For more information, see PS. Ratio Splitters , Flow Chart and PS. Flow Chats sections.

...

Calendar ratio values by period.

...

Stockpiles

Enter capacity limits and turnover triggers.

Info

Use the Delete <Delete> key in Stockpile rows to reset limits and triggers.

Force Mode

Can force a stockpile into build mode, reclaim mode, or off entirely. This allows the user another level of control over stockpile blending.

Turnover Trigger

  • Turnover triggers only apply to Blended and Mutex stockpile types.

  • If a stockpile hits the turnover trigger during the period, it switches from building to reclaiming.

Capacity Limit

  • Stockpile capacity is set by the Chunk Template in PS. Stockpiles Setupstep.

  • Chunk Template capacity is the sum of chunks in PS. Stockpile Chunks step.

  • If the Capacity Limit is set to less than the Total Capacity, then the stockpile will pause building (it will not reclaim).

  • If the Capacity Limit is set to greater than the Total Capacity, then it has no effect.

...

Stockpile Sets

For mutex stockpile sets, Force Mode can force all stockpiles in a set into build mode or reclaim mode.

To determine which stockpile will be reclaimed next, give it a higher priority in the mutex stockpile set or use -1 to force it to immediately switch to reclaiming the chosen stockpile.

...

...

Info

To force stockpiles to build in a certain order, run the schedule, scroll across to the period where the stockpile chosen is not the desired one. Change the priority at this period to force the reclaim order.

Crushers

Enter crusher rates by period.

Info

Note that calculating the rate as target tonnes over working hours only works if the crusher is constantly fed. If there are gaps in the feed, you are better off combining a maximum rate with a period constraint.

...

...

Dumps

Optionally enter dump limits in the calendarCalendar. Note that dumps automatically detect their own volume, so manually constraining their capacity is rarely required.

...

Default Rates

Enter default rates for non-mining activities. These are used to put a cool-down timer between when a blast is exposed and when it can be mined in the Mining Mode schedule runs.

...

...

Haulage Flags

Enter haulage flags by period.

...

Agent Priorities

If two agents are assigned to the same block, the agent with a lower priority will stop and wait for the agent with a higher priority.

...

...

Trucks

Enter truck numbers and time usage.

...

Agents

Enter agent rates, number of allowed trucks and maximum instantaneous trucks. Instantaneous trucks will be the maximum allowed trucks at an instance for a particular transaction set.

...

Calendar agent rates.

Trucks

Enter truck numbers and time usage.

...

Calendar truck numbers.

...

Truck Assignments

Set the maximum trucks that can be used by each fleet grouping.

...

...

Optimisation

Enter cash flows and grade targets.

...