In the Parameters step enter the cycle time parameters for each combination of truck, loader, and material.


Table of Contents

Different payloads and load times may be used for each truck and material.

Fields with normal black text are editable - you can change values in these rows.

Fields with grey text are calculated – values in these rows vary depending on populated inputs.


Selections

When items are selected from the Trucks, Loaders and Materials lists in the Selections panel, they are added into the Parameters table.

  • Hold <CTRL> to select multiple items.

  • Hold <SHIFT> to select a list of items.

When selecting multiple Trucks/Loaders/Materials a new column will appear on the left to allow bulk updating of the fields.


Export and Import

To make populating the table easier, you can use the import functionality. This can be done using a CSV or scripts.

  • Exporting Parameters to File (*ctparam format);

  • Exporting Selected Parameters to CSV;

  • Importing from Saved Parameters;

  • Importing from CSV.


Cycle Time Calculations

Haul Infinity calculates cycle times from first principles using the payloads, swing times, and in-cycle delays.

Loader Payload Calculation

Image RemovedImage Added

  • Enter the bucket payload (t) and volume limit (m3).

  • Haul Infinity calculates the utilized bucket payload.

Truck Payload Calculation

Image RemovedImage Added

  • Enter the truck tray payload (t) and volume limit (m3).

  • Haul Infinity calculates the utilized tray payload.

Mass vs Volume Limitation

Both calculated limitations, Mass and Volume, are limits, that is the Bucket/Tray can either fit 80 tonnes max, or 35 cubic metres, whichever is exceeded first.

Both are affected by the Density you specify in the Materials setup step.

  • If you want limitation by Mass, type in a very high volume which will never be hit.

  • If you want imitation by Volume, type in a very high mass limit which will never be hit.

If you put pillows in the tray which have a very low density, you'll hit the Volume limit before the Tonnes limit, therefore you are limited by Volume.
If you put lead in the tray, you will hit the Tonnes limit before you hit the Volume limit, therefore you will be limited by Mass.

  • It will always default to the lowest of the two values.

  • If you use Overrides, HI will use overridden value.

Loading Calculation

Image RemovedImage Added

  1. Enter the truck filling type:

    1. “FullBuckets” → less swings to fill the tray, some trucks light-loaded.

    2. “FullTrucks” → more swings to fill the tray, last bucket light-loaded.

    3. “Theoretical” → allow the digger to make "half a swing".

  2. Enter the loader cycle time (time to load one bucket).

  3. Enter the loader first pass delay (time to switch between trucks).

  4. Haul Infinity calculates the corresponding load times.

Detailed instructions on the cycle time calculation see here.

Overrides

Image RemovedImage Added

The Overrides section can be used to bypass the cycle time calculations.

For most users, Override inputs may be defined as follows:

Code Block
languagenone
Loader Load Time = Historical Load Time + Spot Time.
Truck Load Time = Historical Load Time.
Truck Payload = Payload (Ore, Waste).

If you are targeting a specific production rate, use:

Code Block
languagenone
Loader Load Time = Truck Payload / Production Rate.
Truck Load Time = Loader Load Time - Spot Time.
Truck Utilized Payload = Payload (Ore, Waste).

Make sure to override both Loader Load Time and Truck Load Time to capture the correct truck and loader rates.

Other Cycle Time Inputs

Image RemovedImage Added

Truck Matching Type

Select the truck matching type:

Code Block
languagenone
“OverTruck” → no digger wait time, some truck queue time.
“UnderTruck” → no truck wait time, some loader hang time.
“Round” → some truck queue time, some loader hang time (round the truck numbers to the nearest whole number).
“Theoretical” → uses the theoretical number of trucks, allowing the fleet to have a number of trucks minimun of 1 or greater using decimal number.
“TheoreticalNoMinimum” → same as theoretical matching type, but the number of trucks can be less than 1 (whole number).
Tip

Tactical Scheduler users are recommended to use “Theoretical” matching for scheduling.

Note that regardless of what’s set in Haul Infinity, APS will always use “TheoreticalNoMinimum” as the truck matching mode. This means that the number of trucks assigned to an individual route is not fixed to an integer, and can be less than 1. This is a requirement for the algorithm as it means trucks become a linear variable instead of an integer variable - which means the solve time for a single instant is a fraction of a second instead of more than a minute (and consider that there are usually 2000+ individual solutions calculated in a two-week schedule run).


Minimum Queue Time

If queue time is already accounted for in the Time Usage Model, then set:

Code Block
languagenone
Truck Matching Type = “Theoretical”.
Minimum Queue Time = 0.

This removes queue time from the Haul Infinity cycle times.


Truck Spot Time at Loader

Enter the truck spotting time for each loader type.


Truck Dumping

If the historical truck dumping time includes the dump spot time, be sure to zero the "SpotAtDumpSeconds" property in Crusher/Stockpiles nodes on the network.

The impact of Truck Spot Time at Dump is dependent on whether Truck Matching is setup as Undertruck/Overtruck.

  • If Undertrucked, a minimum Queue time is assigned, and that is all that applies.

  • If Overtrucked the extra time in the cycle is applied to Queue Time. If no Dumping time is applied, this extra time is classified as Queue, so the overall cycle time remains the same.


Recharge Travel Time Round Trip

If the truck is using power source Battery, then it will take into consideration the time taken to travel to a recharge location and back again.