Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • Gap filling material should be waste or backfill material, if it could be anything else, discuss with the geologists who prepared the Block Model.

  • Select a parcel from a list of parcels preconfigured in the resmodel, or create a new one.

  • Volume is always = 1.

  • Specify default DryTonnes and WetTonnes density, and moisture, if applicable. You can also set grades etc as well, if known.

  • If gaps are present and gap fill is not used, the schedule will apply zero tonnes for this mining area.

  • In this example, wherever there is missing any block model information when it gets interrogated against phase solid, the created Gap Filling Preset is going to be used.

...

To fill Block Model gaps:

...