...
Every table must specify the Bench Level, which is the running level of the trucks. This is used in the generation of On Bench Dependencies to determine bench access and progression.
...
Tables can be added to the project using the add and remove icons.
Click in the Table Name column field to rename it.
Select “Dumps” or “Long Term Stockpile” from the dropdown if it holds dumps/backfills or long term stockpiles to , or “Long Term Stockpile” if it holds stockpiles being used as dumps atm, but will be reclaimed later. More information about Long Term Stockpiles setup see in the section TS. Long Term Stockpiles.
...
Levels can be added to a table using the add and remove icons.
Levels can be ordered using the up and down arrows icons.
Click in the Level Name column field to rename it.
The Bench/Lift Level must be specified at the running level of the trucks.
The Sort Direction column will determine whether benches are listed top to bottom or bottom to top.The Bench/Lift Level must be specified at the running level of the trucks.
Naming Conventions
Constraints
...