The Preschedule step is used to modify blocks to their anticipated state at the start of the schedule.

Table of Contents

...

Manual Preschedule

Blocks can be manually prescheduled by selecting them (either in the block tree on the left, or box-selected in the viewport) and clicking the flag icon in the toolbar.

...

In the Set Manual Preschedule window, enter the percentage of material remaining in the prescheduled block(s).

...

To manually preschedule blocks:

  1. Use the Visibility Mode button to toggle between viewing all blocks, or only the currently selected blocks in the tree.

  2. Select blocks in the viewport.

  3. Press the flag icon from the toolbar.

  4. Set percentage remaining in the block.

  5. Tick Remove Full Prescheduled Blocks.

  6. Press OK.

...

Auto Preschedule

Blocks can be prescheduled from a starting surface via the Flag Auto Preschedule icon. The starting surface must already be loaded into the Layers panel (bottom left).

...

4. Use the Legend button to see colors assigned by the remaining ratio.

...

Error Messages

Info

Note that each block must have values for Volume, Dry Tonnes and Wet Tonnes (or 0 for all of them), otherwise you will get an error message as below and won’t be able to proceed with your project setup.

“Block/parcel (<Reserves/…….>) must have values for volume, dry tonnes, and wet tonnes, or 0 in each.”

...

  1. Check the blocks affected in Rapid Reserver:

    1. Navigate to Rapid Reserver > Designer tab > select the block from ATS Preschedule error message description > check its tonnes and volume in the Reserves tab at the bottom of the screen > most likely you will see the same missing values.

    2. Some blocks can be outside of the Block Model coverage > make sure you are using Block Model Gap Filling function, where default densities (this is essential) and tonnes are assigned (enable “Fill Block Model Gaps' in the Settings step).

    3. If Block Model Gap Filling is used correctly, but the error message in ATS Preschedule persists, check your Reserves mappings in the Block Model step > Reservable Model Generator.

      1. Change the volume and tonnes expressions to exclude blocks with Zero density, ie:

        1. volume = N("density") > 0 ? N("size (X)")*N("size(Y)")*N("size(Z)") : 0, or N("size (X)")*N("size(Y)")*N("size(Z)");

        2. tonnes = N("density") > 0 ? N("size (X)")*N("size(Y)")*N("size(Z)")*N("density") : 0, or N("density") > 0 ? N("size (X)")*N("size(Y)")*N("size(Z)")*N("density") : N("size (X)")*N("size(Y)")*N("size(Z)")*2.5 (density).

      2. Regenerate your Reserves Model and review the changes.

...