Table of Contents |
---|
...
Option | Description | Example | ||
---|---|---|---|---|
Adding Stockpiles manually | To add and remove stockpiles manually use the green plus and red minus buttons located in the top toolbar. The names in the Stockpile Name column must follow this convention:
| |||
Adding Stockpiles from Haul Infinity | You can add all or missing stockpiles from Haul Infinity. For this, use the Add Missing Items button located in the top toolbar.
|
Capacity Field
...
Project Mode | Constrain on Trucks | Optimise Products | ||
---|---|---|---|---|
Finger Pile Type | Projects in Constrain on Trucks mode may choose to load First In First Out (FIFO) or Last In First Out (LIFO) logic. In Tactical Scheduler, FIFO and LIFO refer to the reclaim sequence of the piles within the stockpile fingers. |
Otherwise, you’ll get an error message preventing you from proceeding further through the setup without a correction.
To fix, either select “WeightAveraged” finger pile type, or change the project mode to the “Constrain on trucks”, if required to use FIFO or LIFO stockpiling logic. | ||
Example |
Finger Pile Size
...
Description | Example |
---|---|
| |
The example on the right shows a setup for a stockpile which has fingers for all parcels. Each parcel finger is comprised of piles with a capacity equivalent to the value defined under the Finger Pile Size column. Pile number 3 in both the MG finger and the HG2 finger has not yet reached the 20,000t threshold, and therefore can't be reclaimed. If "LIFO" was selected in the Finger Pile Type column, this would cause there to be no reclaiming of HG2 or MG material. | |
The same logic applies if a Mutex Subset is chosen as the Parcel Finger Type. In the example, there is one finger comprising of material type “SP BLEND”. Within that finger, there are multiple piles, each having a capacity equivalent to the value defined under the Finger Pile Size column. If a pile has not met the threshold, it cannot be reclaimed. | |
Through FIFO and LIFO, it is possible to force a stockpile which comprises of a single material type to be fully built before it can be reclaimed. This can be achieved by setting the Finger Pile Size to the capacity of the stockpile. |
...
Explanation | Example |
---|---|
If we consider that setup of ROM_2 which has the Finish Pile at Period End option enabled, it can be observed that material is reclaimed off the stockpile before a 40,000t pile has been constructed. When using this option, the quantity reclaimed cannot exceed the closing balance of the previous period. This is why in period 3, only 3,631 tonnes of material is fed to the crusher despite there being 18,605 tonnes at the end of the period. |
Manual Reclaim
...