Versions Compared
Version | Old Version 1 | New Version Current |
---|---|---|
Changes made by | ||
Saved on |
Key
- This line was added.
- This line was removed.
- Formatting was changed.
RU 🇷🇺
Tip |
---|
To determine conformance, Start and End schedule surfaces are required. These surfaces can come from external software or be generated directly through the Stage Plans steps in Alastri Spatial Conformetrics. |
One benefit of using Stage Plans is that you can account for actual mining direction when generating schedule surfaces. This means that if a block is 50% scheduled and 50% mined, it can achieve 100% conformance regardless of the originally scheduled mining direction.
Stage Plans Setup Task consists of three steps:
Child pages (Children Display) |
---|
Stage Plans steps are only visible if Generate Stage Plans option is flagged in the Settings step.
...
Image Added