Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Option to fill voids in block models with a default material. This is useful where the current mining solid surface is higher than the clipped block model extents (such as backfill ramps).

...

outside of the Block Model extents.

  • Gap filling material should be waste, if it could be anything else, discuss with the geologists who prepared the Block Model.

  • If gaps are present and gap fill is not used, the schedule will apply zero tonnes for this mining area.

...

To fill Block Model gaps:

  • Create a new gap filling presetGap Filling Preset, such as “backfill”“waste”.

  • Assign the material type, volumes, tonnes, and other block model parameters. In , when applicable

  • If multiple gap fill material presets are created, in Setup > Phase Details, toggle which phases use which preset.

    • Areas outside of the Block Model extent will be calculated as containing material set as Gap Filling.

...