Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

The Schedule Auditor is a tool provided expressly for mine schedulers, to generate bulk haulage calculations across an entire schedule. To use this feature, you must supply an existing schedule that specifies sources, destinations, loaders, trucks and materials moved. Haul Infinity will then generate the full cycle time breakdown and 3D haul strings for each schedule record. This can be used to estimate truck fleet mobilisation and utilisation over time.

Table of Contents
Info

The schedule auditor requires a schedule to be imported. If you require scheduling assistance, ask us about the Alastri Tactical Scheduler.

Pre-Start Check

Inspect the schedule for errors:

...

I’m going to do my second jab today, so will be probably sick and working from home tomorrow and have a good look at MadCap

Schedule Import from CSV

Import to Haul Infinity:

  1. Navigate to the sample data \NodesVersion folder.

  2. Open SampleModelWithNodes.hinf

  3. Find the Schedule Auditor tab below the viewport, and open it.

  4. Click the Import Schedule button.

...

10. Click FINISH when the import is complete.

Info

The Sources and Destinations must exactly match between the Schedule and the Haul Infinity project. This means that for every source or destination in the schedule, there must be a node or a block that has that name. Moreover, if the schedule specifies a haul from source A to destination B, then there must a physical path on the network for a truck to travel between A and B. 

Schedule Import from Scheduler

If you are using Haul Infinity within the Scheduler (ATS or APS), you can import a schedule directly from the scheduling app.

  1. In Alastri Tactical Scheduler:

    1. Run all the Setup Tasks.

    2. In the Schedule tab, run Scenario or Full Schedule.

  2. In Haul Infinity:

    1. In the top tab bar locate the Scheduler tab.

    2. Select “Import from Scheduler”. Imported strings will be displayed as a list in the Scheduler Auditor tab.

    3. Double click any line in the list to animate the haul in the viewport.

...

Schedule Audit

Double click the first line in the schedule auditor to activate the haul in the viewport. We can use the arrow keys to move forward and backward through the schedule; this lets us inspect the haulage solutions provided by Haul Infinity and make any functional changes to the network as required.

...

We may at any time switch to the Charts, Truck Times and Cycle Time Analysis tabs for more detail on the active haul.

Info

Roads can be flagged open or closed in the schedule. Use flags to model a changing road network over time.

Schedule Export

Once you have audited the schedule to your satisfaction, the calculated results can be exported for use in cost modelling and fleet selection.

...