...
Press the Flag Auto Preschedule icon above the viewport.
In the Preschedule with Surface window:
choose the preschedule surface;
set the minimum and maximum thresholds (values outside of threshold will be rounded up or down).
Tick the records to be prescheduled.
...
4. Use the Legend button to see colors assigned by the remaining ratio.
...
Info |
---|
Phases assigned to the Long Term Stockpile table can be added as both a fillable destination and a reclaimable source. The source and destination phases can be referenced in the “Destination Logic” and “Steps Logic” to handle the movements to and from the Long Term Stockpile. |