With При использовании версий Conformetrics 2.0 and above, users can choose to account for actual mining direction in generated stage plans. This means that, if a block is 50% scheduled and 50% mined, then it can achieve 100% conformance regardless of the original scheduled mining direction.

1. Export from Scheduler

Go to Tactical Scheduler > Schedule tab > Animation tab > save icon Image Removed > Export Blocks for Conformance > save to working folder.

Image Removed

Export blocks from scheduler

2. Toggle Settings

Go to Conformetrics > Setup tab > Settings step > Options > toggle 'Generate Stage Plans' and 'Import Scheduling Blocks' to true.

Image Removed

Toggle 'Generate Stage Plans' and 'Import Scheduling Blocks' to true.

3. Import Solids

In Setup > Stage Plans > Solid Import > import the scheduling blocks from Tactical Scheduler.

Info

For users of third-party scheduling applications, blocks can be imported directly from a folder or zip file. Any underscores in the file name will be treated as level name delimiters in the block tree.

Image Removed

Import blocks for conformance.

4. Solid Properties

In Setup > Settings > Solid Properties > set the solid properties to Source or Destination.

Image Removed

Set the solid properties to Source or Destination.

5. Schedule Sequence

In Setup > Settings > Schedule Sequence > review the mining schedule.

  • Drag the slider to move forward and backward through the transactions.
  • Click in the CSV rows to view a specific transaction.
  • Press the Next Period / Previous Period buttons to jump between time periods.
Info
For users of third-party scheduling applications, press the 'Import Schedule' button to import from CSV.

Image Removed

Click on a schedule row to see the mining surface at that time.

6. Generate Stage Plans

Press the 'Generate Stage Plans' button and select the appropriate periods to generate.

...

Optionally select a matching survey surface.

This is used to detect the actual mining direction to use in each scheduling block.

...

Clips out topography and designs farther than this distance from the blocks.

...

Image Removed

Generate Stage Plans dialog.

Info

If a block is partially mined at the selected date, then the stage plan will apply a mining direction that matches the Survey Actual surface.

7. Run Conformance

Once the stage plans have been generated, finish the Setup tab and evaluate spatial conformance.

Image Removed

Main conformance view.

и выше пользователи могут включить в создаваемые планы стадий фактическое направление разработки. Это означает, что если блок на 50 % запланирован и на 50 % разработан, то он может достичь 100 % соответствия, независимо от исходного запланированного направления разработки. 

Info

Шаги настройки планов стадий разработки отображаются только, если в шаге Settings (Настройки) был установлен флажок для варианта Generate Stage Plans (Создавать планы стадий разработки).

Шаг настройки Stage Plans (Планы стадий разработки) включает три шага:

Child pages (Children Display)

По завершении создания планов стадий разработки, закончите настройку проекта (заполнив и подтвердив все шаги) и оцените пространственное соответствие во вкладке Conformance.

...