Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

RU 🇷🇺

...

To determine conformance, Start and End schedule surfaces are required to determine conformance. These surfaces can come from external software or be generated directly through the Stage Plan Plans steps in Alastri Spatial Conformetrics.

One benefit of using Stage Plans is that you can account for actual mining direction when generating schedule surfaces. This means that if a block is 50% scheduled and 50% mined, it can achieve 100% conformance regardless of the originally scheduled mining direction.

...

Child pages (Children Display)

...

Stage Plans steps are only visible if Generate Stage Plans option is flagged in the Settings step.

...