In the Settings section, you may set units of measurement, options and thresholds to use in the project, as well as hatch patterns and labels.
Table of Contents |
---|
...
Enter all global settings to change the behaviour of the project.
Table of Contents |
---|
...
Units | Select the units of measurement which match your site coordinate system and local standards. Use the Quick Set dropdown to select Metric or Imperial units of measurement. | ||
Options | In this section, you can configure the parameters of your model. | ||
Use Block Model | If enabled, block model can be loaded into project for reporting purposes. | ||
Generate Stage Plans | Optional feature to generate stage plans from scheduling blocks. Enables additional setup steps. | ||
Grid Size (Reserving) (m) | Grid spacing to use in reserving calculations. | ||
Grid Size (Solids) (m) | Grid spacing to use in 3D solid visualization and export solids. | ||
| |||
Minimum Height Threshold (m) | Set this value to discard trivial solids from being displayed. | ||
Minimum Bench Volume (m3) | Set this value to discard trivial volumes from reporting. | ||
Display Solid Minimum Shard Volume (m3) | Set this value to discard trivial shard solids from displaying in the viewport. | ||
Skip Solid Operations | If enabled, domain type solids won’t be merged which can lead them to being invalid when importing into other applications. It is recommended to leave this turned off. | ||
Hatch Patterns | In this section, you can configure the visual component of bounding polygons in your model. | ||
Active Polygon Hatch | Pattern used to visually define the active polygons. | ||
Invert Active Polygon Hatch | When enabled, the ‘Active Polygon Hatch’ pattern switches to the area outside of active polygons. | ||
Inactive Polygon Hatch | Pattern used to visually define the inactive polygons. | ||
Labels | In this section, you can configure the naming of surface categories as well as compliance categories. | ||
Surfaces | The name of the Production and Schedule surfaces can be changed from their default values to a user-defined value. The names of these surfaces appear in several places in the application. | ||
Production Start | The name of the surface which represents the production start surface. | ||
Production End | The name of the surface which represents the production end surface. | ||
Schedule Start | The name of the surface which represents the schedule start surface. | ||
Schedule End | The name of the surface which represents the schedule end surface. | ||
Schedule Future | The name of the surface which represents the schedule future surface. | ||
Compliance | The name of the 'Compliance' report fields can be changed from their default values to a user-defined value. The names of these categories appear in the table reports. | ||
Plan Compliance (In Plan / Scheduled) | The name of the report field which reports in plan solids over scheduled solids. | ||
Plan Compliance (Compliant / Scheduled) | The name of the report field which reports complaint solids over scheduled solids | ||
Plan Performance (Production / Scheduled) | The name of the report field which reports production solids over scheduled solids. | ||
...