Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

RU 🇷🇺

...

Table of Contents

Overview

Conformance results will be displayed in a table report which is configurable in the Table Options step. The configuration options are detailed below.

...

Adding Table

In the Table Options panel, click the blue plus icon to add a conformance table template that you can customize according to user preferences and use in reports.

...

Table report templates can be renamed, moved up and down in the list, saved and loaded, as well as copied and deleted, using the toolbar buttons.

...

Row Visibility

All reportable fields are listed, which can be toggled on or off. If the field is toggled off, the field will not appear as a report row. Descriptions of the fields reporting conformance values are outlined below.

Description

Value Row

Description

Field

Show or hide the field with the column names.

Planned/Production Component > Parts > Domain Category

The column value (Volume, Tonnes) that is associated with the domain solid.

Parts Total

The sum of the individual domain solids for the specified column (Volume, Tonnes)

Total Solid

The volume of the initial solid generated from the start and end surfaces. The initial solid is before any error, or simplification processes are performed.

Error

The difference in solid volume between the Total Solid and Parts Total → Error = 1 - (Parts Total / Total Solid)

Plan Compliance (In Plan / Scheduled)

Cut in Plan Solid Volume / Planned Parts Total Solid Volume

Plan Compliance (Compliant / Scheduled)

Solid Volume of domains marked as “Conformant” / Planned Parts Total Solid Volume

Plan Performance (Production / Scheduled)

Production > Parts Total Solid Volume / Planned Parts Total Solid Volume

...

A preview of the report for the select polygon can be viewed in the Preview panel.

...

Раздел документации на русском языке 🇷🇺

. If required, return to the panels above and make changes.

...