Set the bench template, block model, and enclosing surfaces for each polygon.
Quick notes:
- Polygons can be organised in a tree by using delimiters for levels, such as "Pit1/Stage1".
- Details may be assigned to multiple polygons at once by multi-selecting with the Shift and Control hotkeys.
- Surfaces may be dragged and dropped from the Layer panel into the Surfaces rows.
Add a polygon for each reporting area in the mine.
Populate the polygon details in the table on the right:
Options | |
---|---|
Bench Template | Choose the bench heights. |
Block Model | Choose the block model. |
Production Surfaces | |
Production Start | Survey surface from the opening date. |
Production End | Survey surface from the closing date. |
Schedule Surfaces | |
Schedule Start | Plan depletion surface from the opening date. |
Schedule End | Plan depletion surface from the closing date. |
Schedule Future | (Optional) Plan depletion surface for the next time period. |
The Schedule Future surface may be used to differentiate between Over Dig and Out of Plan material. See SC. Анализ топографии областей for more information.