PS Calendar Switches
Calendar Switches allow the schedule to switch to a different set of operating conditions and rulesets. This can be used, for example, to switch between Day and Night shift, Hot and Cold seasons, Dry and Wet processing, Premium and Regular stockpile builds, and so on.
Calendar switches can be referenced in the Work Restrictions, Destination Rules, and Flow Chart steps.
Setup > Calendar Switches.
To add a Calendar Switch:
In the panel which contains the ‘Calendar Switch’ table, press the blue plus button.
Rename the new calendar switch to something meaningful.
In the panel containing the ‘Options’ table, press the blue plus button.
Rename the new option to something meaningful.
Add in all required options which exist for the calendar switch.
The order in which the options are listed does not affect anything.