PS Delays
Delays in the Delays step represent periods of time where equipment is not doing the primary function it was designed to do, such as drilling, loading or hauling.
To add a Delay:
Press the blue plus icon.
Select the a field from the Name column and rename it, i.e. “Crib Break”.
Set delay configuration as per table definitions below.
Column | Description |
---|---|
Name | Name of the delay |
Is Considered Available |
|
Equipment Moved |
|
Power Type |
|
Color | The color which will be used to represent the delay on the Gantt chart |
The order of Delays in this list, impacts how overlapping delays are reported. Higher ranking delays will be reported before lower ones.