APS Final Configuration
Update final configuration.
Setup > Final Configuration.
Haulage | Configure integration with Haul Infinity |
---|---|
Calculation Timeout (s) | How long APS will wait for Haul Infinity to complete its calculations before giving up and returning control of the program to the user. |
Haulage Materials | Choice of Mutex Parcel Subset for representing payloads in Haul Infinity. Example: 26 material types may only need two payload quantities (ore, waste). |
Destination Fill Sequencing Method | Option to use quickest <TravelTime> or shortest <Distance> in deciding which dump to fill first in the sequence |
Quick Truck | Default truck to use for pathfinding calculations in Haul Infinity. |
Â
Applied date format
Gantt | Description |
---|---|
Do Nothing When No Sequence | Toggles whether a digger obeys the https://micromine.atlassian.net/wiki/spaces/PS1D/pages/28705992 when it has no sequence (ie. have crib breaks and shift change). |
Blasting | Description |
---|---|
Blast Exclusion | Blast Exclusion radius. Any Agent working within this radius of a block being blasted will stop for the duration of the blast window |
Optimisation | Inputs to incentivise the Agent to follow requirements |
---|---|
Default Movement Cash | Incentive to keep digging (even if no other optimisation input is specified). |
Agent Priority Cash | Controls how strictly the diggers adhere to the Agent Priorities in the Calendar. |
Destination Order Cash | Reward for honouring the list order of destinations in a destination rule. |
Destination Affinity Cash | Reward for continuing to send a reserve block to the same destination (instead of splitting it across stockpiles). |
Mutex Fill Order Cash | Incentive to fill the largest stockpile in a mutex group (has the effect of minimising turnover time). Enter -1 to disable out-of-order filling entirely. |
Stockpile Priority Cash | Incentive to reclaim stockpiles in order, when multiple stockpiles are added to a single Gantt sequence. |
Hours between new Stockpile Decisions | Time period before a Loader moves to another Stockpile. Reduces the times the optimiser will move a loader between stockpiles if has multiple options available |
Hours between new Stockpile Decisions (-1 to disable) | Time period before the Agent evaluates whether to reclaim a new stockpile. Reduces the times the optimiser will move a loader between stockpiles if has multiple options available. Time before |
Exports | Setup feed export for input to another schedule |
---|---|
Split on Period Boundary | Default. APS will export periods as defined by the calendar |
Split on Breaks in Feed | Select this option to allow split on Breaks in Feed |
Hours Between Splits | Export on smaller time periods than those setup in the schedule |
These exports are for import to another Project using a second site for feed https://micromine.atlassian.net/wiki/spaces/4ASSD/pages/31524403
Simultaneous Charging | Controls level of charging that can occur on a blast that is still being drilled |
---|---|
Simultaneous charging will allow the explosive loading to start on a blast pattern before drilling has finished on that pattern. one of two options can be selected. | |
Percentage Buffer (-1 to use Quantity) | The percentage of the pattern to be drilled before loading can commence. Default is 100%, complete drilling before loading can commence. |
Quantity Buffer (length) ( -1 to use Percentage) | The meterage advance of the drilling on the pattern to be drilled before loading can commence. |
Note: If Charging has been made dependent on Production Drilling in the Activity Sequences, Simultaneous Charging cannot happen. Remove this dependency if Simultaneous Charging is to be used.