10/9/2020 - Early Access Release
10/9/2020 - Early Access Release
Alastri is pleased to announce the release of its latest versions of software.
Alastri Production Scheduler 20.3.384
Bug Fixes
Simultaneous Charging
Fixed an issue where simultaneous charging was not behaving correctly when being used on a pre scheduled block.
Gantt
Fixed an issue where an error would appear when using the mouse wheel to increase the start/end time of a blast window in the properties panel.
Fixed a crash occurring when attemting to split a sequence at slider location, if the slider was outside the sequence.
Animation
Fixed an issue where presplit blast smoke was appearing in the "Animation" viewport incorrectly.
Reporting
Fixed an issue where reports with multiple data columns were not exporting correctly.
Improvements
Animation
Improved the way dependencies are displayed on the viewport. Intrablock dependencies no longer appear.
Layers panel
Added a new option "Overdraw" that can be applied to both triangle collections and polylines/points.
Layer panel > spiderweb icon > draws edges on triangulations, draws overdraw on polylines.
Layer panel > spiderweb icon > draws edges on triangulations.
Layer panel > spiderweb icon > draws overdraw on polylines.
Rapid Reserver 20.3.384
Bug Fixes
Bench Preconditioning
Fixed an issue where "Bench Preconditioning" thickness shading was displaying incorrectly when z exaggerated.
Wall Control Designs
Fixed an issue where unnecessary context menu items were showing when right clicking on a bench in the "Wall Control Designs" setup task.Tactical Scheduler 20.3.384
Improvements
Scripting
Added the CustomShading property "IsTooSmall", which is available when creating a complex, custom shading.
Spatial Conformetrics 20.3.384
No changes for this release
Haul Infinity 20.3.384
No changes for this release