x/9/2022 New Release v22.2.23xx

Alastri is pleased to announce the release of v22.2.23xx.


Haul Infinity

Improvements

  • Loaded and Unloaded Trolley Assist

    • Trolley Assist has been split into two options Loaded Trolley Assist and Unloaded Trolley Assist.


Alastri Production Scheduler

Improvements

  • Added more translations for English text into Russian.

Bug Fixes

  • Setup

    • Fixed a crash occurring when running setup on specific projects.

    • Fixed an issue where Shading dropdowns were not showing all options in some cases for Record Removal, Preschedule and Record Subset setup tasks.

  • Gantt

    • Fixed an issue where an empty string was showing on the Gantt sequence context menu if no name was given to the sequence. Menu options will now show name as first block scheduled.


Rapid Reserver

Bug Fixes

  • Setup

    • Fixed an issue where wall values were being reset on Wall Control Designs after editing and rerunning setup.


Spatial Conformetrics

Improvements

  • Added more translations for English text into Russian.


Alastri Tactical Scheduler

No specific changes for this release