Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 4 Next »

The Dependencies setup tasks allow users to set different dependencies for a project. Dependencies control the logical order in which blocks are extracted from the pit and filled in the dump.

Main dependency types are listed in the table below. Navigate to the relevant sections to find more detailed information.

Step

Description

TS. Phase Adjacencies

Phase adjacencies are used to ensure that a backfill dump does not encroach within the standoff distance of unmined blocks.

TS. On Bench

Set dependencies between blocks, and bench access, by ramp point or direction.

TS. Between Benches

Allows user to plan multiple benches mining in a single phase.

TS. Increment Offset

Synchronize vertical offsets values between stages.

TS. Custom

Specify dependencies between any two records, including upper level records.

TS. Drilling

Specify exclusion zones and blasting delays.

This setup step only appears if in the Configuration Options step you ticked Use Dependencies option.


Раздел документации на русском языке 🇷🇺

  • No labels