20.4 - Early Access Release

Alastri is pleased to announce the release of its latest versions of software.

Alastri Production Scheduler 20.4.x

Major Improvements

After moving the sequence, the original location of the sequence, as well as sources and destinations will remain visible

  • Schedule Invalidation Changes

    • Now, when making changes to the Gantt, APS will no longer invalidate the entire schedule. It will only invalidate anything from the point in time where the changes have been made.

Part of schedule requiring rerun will show as orange

  • Blasting Improvements

    • Users can now manually schedule blasts in a blast window, even if they are not yet available for blasting.

    • The Blasts row will always display the blasts which are scheduled. After running a schedule the icon on the left will update, indicating if the requested blast was actually completed.

    • Blast windows can be moved and updated without needing to re-run the schedule. Production Scheduler will attempt to display the blasts that are predicted to be available at the current blast window.

Manually scheduled blasts will appear in green in the blast window dialog

Users can add blasts manually to a blast window.

Blast windows will always display the scheduled blasts. After running the schedule, an icon indicates if the blast was actually completed.

Auto-blast windows update when moved, always displaying currently available blasts.

  • New Default Gantt Display label options

    • There are two new default options to choose from when configuring the Gantt display, “<FullNameDefault>” and “<ParcelDefault>”.

Max Agent Rate is now available per sequence in the Gantt

New “Truck Assignments” setup task

  • Users can now constrain trucks in three places on the Calendar:

    • Per “Truck”

    • Per “Agent”

    • On “Truck Assignments”

Number of Units can be set per truck

Truck Assignments can now be applied per Agent

Truck Assignments

Add JiT Dependencies from the Gantt

Set Single Destinations per parcel

Concatt Labels

  • Filter Chrono reports by Blast/Dig Solid text fields https://alastri.atlassian.net/browse/PS-1333

    • Users now have the ability to filter Chrono reports by Blast/Dig Solid text fields that they have created on the “Fields” setup task.

  • 'Lock or Freeze' Surfaces in Sequence Painter https://alastri.atlassian.net/browse/PS-1424

    • Users now have the ability to 'Lock or Freeze' Surfaces in Sequence Painter to allow users to choose blocks under a visible surface.

New Reporting items

Rapid Reserver 20.4.x

Improvements

New Grade Control setup task layout

Grade Control setup is now all in one dialog.

Strip Renamer tool is now available in the Designer.

  • Depletion Surfaces

    • Phase import and depletion has been changed. To apply depletion surfaces, import them from layers to the global collection of depletion surfaces. Then each phase can be assigned any of the following:

      • Upper depletion - remove all material above this surface.

      • Lower depletion - remove all material below this surface.

      • Upper RL - remove all material above a fixed Z.

      • Lower RL - remove all material below a fixed Z.

Depletion Surfaces have moved from Phase Details to the new setup item ‘Depletion Surfaces’.

  • Excluded Areas

    • In this step the user can optionally define polygons for each phase. Any material outside of the defined polygons (in the darker area of the viewport) will be removed from the phase.

    • When the camera orientation is vertical, the phase will be displayed with the depleted solid's vertical thickness indicated according to the position of the slider to the left of the viewport, with a colour for 'zero' thickness, 'above' and 'below' the threshold. The colours can be selected in the panel on the bottom left.

    • When the camera is not oriented vertically, the phase is displayed as in the Phases step.

Users can exclude material from a phase in the new ‘Excluded Areas’ setup item.

  • Phase Details

    • Depletion surface is no longer assigned in Phase Details.

    • Use ‘Show Depleted Solids’ checkbox to toggle display of original and depleted phase solids in the viewport.

  • Bench Preconditioning

    • New option to 'remove' material added to the existing 'send up/down' actions.

    • Users can customise the colours displayed in the Bench Preconditioning viewport.

Users can now exclude material at the bench level in Bench Preconditioning

Haul Infinity 20.4.x

Alastri Tactical Scheduler 20.4.x

Spatial Conformetrics 20.4.x