Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Parameter

Description

Export Key Column from Chrono Reports

Enable this option if you want to export Key column from Chrono reports.

Export Units Column from Chrono Reports

Enable this option if you want to export Units column from Chrono reports.

Default Truck Type

Select one of the Truck types (from added in the Truck Types setup step) to be used as default in the project.

For schedules using Optimise Products mode (enabled in Configuration Options setup step), any overflow will be calculated using the Default Truck Type, set in this field. 

Default Loader Type

Select one of the Loader type (from added in the Loaders Types setup step) to be used as default in the project.

For schedules using Optimise Products mode (enabled in Configuration Options setup step), any overflow will be calculated using the Default Loader Type, set in this field. 

An Overflow Loader must load an Overflow Truck. Even if there are truck hours available, if the schedule doesn't have any real loaders, then it cannot load them. 

Haulage Materials

Select a set of haulage materials from the preconfigured mutex parcels groups representing truck payloads in Haul Infinity.

Reserves tab > Data panel > gear icon > Mutex Parcel Subsets > (create or edit) Haulage parcels

Haulage Quantity Type

Haulage Quantity Type is always set to wet tonnes, so that no conversion is required to match the bucket and tray payload units in Haul Infinity > Setup > Parameters.

Fill Sequencing Type

Set Fill Sequencing Type defaults to "Travel Time", since "Distance" may choose a less fuel-efficient elevation profile.

Process Optimised Stockpiles Last

Processing the rehandle transactions last will concentrate truck overflow in the rehandle fleets, instead of spreading it across multiple production fleets. For example, if a digger is shared between the pit and the ROM, "Process Optimised Stockpiles Last" flag will cause it to overflow in the rehandle fleet instead of the production fleet.

Use Serial Blasting Delays

Set up blasting so it can only run on one blast at a time. This approximates a bomb crew that cannot be on more than one shot at once.

Drilling Hatch Pattern

Choose from the dropdown the hatching style which represents drilling areas in the Animation tab.

...