Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

In the Production Mode Features step you may select what mine production activities to include in the project.

...

Table of Contents

...

Production Features

Activity

Planning Function

Model drilling of blast holes?

Production drilling.

Model charging of blast holes?

Explosives loading.

Model drilling of presplit holes?

Presplit drilling for wall control.

Model charging of presplit holes?

Explosives loading of Presplit holes . (Does does not create mineable stock). Used mostly for Wall Controls activities.

Model drilling of holes not related to blasting (grade control, dewatering)?

Grade control delay. Unlocks the Misc Drilling tab in the Feature Settings panel below, where you can set Hole Density Factors.

Model blasting?

Blasting delays.

Model a generic activity that occurs before drilling commencing?

Pattern cleanup or wall scaling delays.

Model a generic activity that occurs before any mining commences?

Post blast delay. Levelling blast heave, prepping area for dig unit access.

Import a schedule for spatial guidance?

Compare spatial production schedule conformance against plans from ATS or APS.

Import or specify non-spatial guidance?

Compare production schedule targets or metrics from other plans.

Import a product stream from another site for further processing in this model?

Adjust crusher feed to offset another site’s rail grades. Used mostly for the Second Site feed modelling.

Model wall panels and related activities

Unlocks Wall Panels tab, where you may add Activities and Wall Dependencies.

Feature Settings

The Feature Settings panel is for animation visualization only.

...