3/12/2021 New 21.3 Release

Alastri is pleased to announce the release of v21.3.1053.


Alastri Production Scheduler

Improvements

  • Export Stage Plans for specific periods

    • It is now possible to export stage plans for selected periods. Previously when exporting stage plans, these could only be done for all periods, or for the current period.

  • Script Extensions - Extension Data Sources Validation Check

    • It is now possible to add a validation check for Extension Data Sources in the same way it is done for Extension Parameters.

  • Idle Time Report Fields

    • Two new fields, Agent.Operating Idle Hours and Agent.Operating Idle Factor are now available. Fields are available when creating Agent reports, and are alos available in the Steady State tab.

    • Agent.Operating Idle Hours is calculated as the actual rate the agent operated at divided by the max rate at which the agent could have mined at.

    • Agent.Operating Idle Factor is Agent.Operating Idle Hours multiplied by the steady state duration.

Bug Fixes

  • Reporting

    • Fixed an issue where a crash occurred after docking the Reporting tab if a report was also undocked.

  • Schedule

    • Fixed an issue where the schedule failed to progress for certain projects.

  • Automated Dig Lines

    • Fixed an issue where dig lines created after running Automated Dig Line Creation tool were not being connected.


Alastri Tactical Scheduler

Improvements

  • Export Stage Plans

    • It is now possible to export stage plans for selected periods. Previously when exporting stage plans, these could only be done for all periods, or for the current period.

Bug Fixes

  • General

    • Fixed a crash occurring when closing certain projects after running the schedule.

    • Fixed a crash occurring when redocking a popped out report, after undocking and redocking the Reporting tab.

  • Infrastructure Reporting

    • Fixed an issue where Heritage items were not showing correctly in reports.

  • Long Term Stockpiles

    • Fixed an issue where only one phase was allowed to be mapped to a Long Term Stockpile.


Rapid Reserver

Improvements

  • Designer viewport

    • Added functionality to select all points under the cursor by Shift-Clicking when moving or deleting points in the Designer viewport. Similarly, using Shift-Click when adding points will add points to all construction lines under the cursor.

Bug Fixes

  • Designer

    • Fixed an issue where all walls of a block were not being selected correctly when clicking and dragging to select.

    • Fixed an issue where pressing “q” while using Create Polygon/Construction Line was changing the function to Quick Extend.


Spatial Conformetrics

Improvements

  • Export Stage Plans

    • It is now possible to export stage plans for selected periods. Previously when exporting stage plans, these could only be done for all periods.


All Products

Bug Fixes

  • Issues importing DXF Layers

    • Fixed an issue where layers were showing with zero triangles when certain DXF files were being imported as “Modern AutoCAD 2013 DXF”.

    • Fixed a crash occurring when importing certain DXF files that contained non-multiline text.

  • Layers panel

    • Fixed an issue where display options applied to a folder on the Layers panel were not saving with the project.


Haul Infinity

No specific changes for this release


  • No labels