In the Parameters step enter the cycle time parameters for each combination of truck, loader, and material.
Different payloads and load times may be used for each truck and material.
Fields with normal black text are editable - you can change values in these rows.
Fields with grey text are calculated – values in these rows vary depending on populated inputs.
Selections
When items are selected from the Trucks, Loaders and Materials lists in the Selections panel, they are added into the Parameters table.
Hold <CTRL> to select multiple items.
Hold <SHIFT> to select a list of items.
Cycle Time Calculations
Haul Infinity calculates cycle times from first principles using the payloads, swing times, and in-cycle delays.
Loader Payload Calculation |
|
Truck Payload Calculation |
|
Loading Calculation |
Detailed instructions on the cycle time calculation see here. |
Overrides | The Overrides section can be used to bypass the cycle time calculations. For most users, Override inputs may be defined as follows: Loader Load Time = Historical Load Time + Spot Time. Truck Load Time = Historical Load Time. Truck Payload = Payload (Ore, Waste). If you are targeting a specific production rate, use: Loader Load Time = Truck Payload / Production Rate. Truck Load Time = Loader Load Time - Spot Time. Truck Utilized Payload = Payload (Ore, Waste). Make sure to override both Loader Load Time and Truck Load Time to capture the correct truck and loader rates. |
Other Cycle Time Inputs | Truck Matching TypeSelect the truck matching type: “OverTruck” → no digger wait time, some truck queue time. “UnderTruck” → no truck wait time, some loader hang time. “Round” → some truck queue time, some loader hang time (round the truck numbers to the nearest whole number). “Theoretical” → zero queue or hang time (uses the theoretical number of trucks without rounding, allowing the fleet to have “half a truck” (a decimal number of trucks). “TheoreticalNoMinimum” → same as theoretical matching type, but not including minimum waiting time. Tactical Scheduler users are recommended to use “Theoretical” matching for scheduling. Minimum Queue TimeIf queue time is already accounted for in the Time Usage Model, then set: Truck Matching Type = “Theoretical”. Minimum Queue Time = 0. This removes queue time from the Haul Infinity cycle times. Truck Spot Time at LoaderEnter the truck spotting time for each loader type. Truck DumpingIf the historical truck dumping time includes the dump spot time, be sure to zero the "SpotAtDumpSeconds" property in Crusher/Stockpiles nodes on the network. The impact of Truck Spot Time at Dump is dependent on whether Truck Matching is setup as Undertruck/Overtruck.
Recharge Travel Time Round TripIf the truck is using power source Battery, then it will take into consideration the time taken to travel to a recharge location and back again. |