PS Maximum Benches

Limit an activity occurring on a bench until the Nᵗʰ bench above has had that activity completely carried out. I.e., You can’t drill the 500RL until all of the records in the 530RL have been completely drilled.

To set the Max Active benches:

  1. Select the relevant activity from the Activities table.

  2. Expand the record tree to the required level of granularity.

  3. Select record from record tree.

  4. Set the value for the maximum active benches.

Setup > Maximum Benches.

Setting the value for a parent node will result in all child nodes inheriting the same value.

Â