PS. Period Plots tab
The Period Plots tab is used to present 2D graphical plots of the selected activities in a given time period.
Select a bench/flitch or lift from the tree on the left and its blocks will be displayed in the main viewport.
Use the <CTRL> and <SHIFT> keys to select multiple levels from the tree structure on the left.
Note that it is not possible to display the level of the entire pit or stage, the selection may only contain benches, flitches and lifts.
In the Template field, select the desired template to display.
Click the gear icon to open the Plot Settings window, where you can set the display parameters for the different components.
Plot Settings dialog items
Field | Usage |
---|---|
Title |
|
Labels |
|
Legends |
|
Scale | Select how to display a scale below the map ("Scale", "Grid", "None") |
Image Size | Enter the width and the height of the plot |
Legend | Tick to show used periods only |
Period | Select what periods to show |
Expand | Optionally specify Expand Distance |
Select the activity type from the Activity field dropdown: it can be “ProductionDrilling”,“Mining” or “ProductionBlasting”.
Use the Label dropdown to select which labels you want to display on the plot (in the example below, wet tonnes).
Select a period subset from the Period Subset field dropdown. The default setting is <All Periods>.
You can also save and export the displayed plot directly from the viewport by right-clicking and selecting "Save" from the dropdown.
If Show Legends is checked in the Plot Settings window, you will see a legend of color assignments by period on the right side of the viewport.