PS. Introduction
Alastri Production Scheduler is used to generate detailed two week plans of mining activities such as drilling, charging, blasting, mining, hauling, stockpiling, crushing, and product handling.
- 1 Overview
- 1.1 Scheduling and Animation
- 1.2 Gantt chart
- 1.3 Equipment Usage
- 1.4 Destinations
- 1.5 KPIs
- 2 Terminology
- 2.1 General
- 2.2 Setup
- 2.3 Data
- 2.4 Navigation
Overview
Scheduling and Animation
Gantt chart
Equipment Usage
Destinations
KPIs
Terminology
General | |
---|---|
Project | Alastri Production Schedule file type with a “.aps” extension. |
Scenario | A set of time-based schedule inputs. |
Report | Schedule results summarized in tabular form. |
Period | Schedule time increments. |
Run | The software process of generating a schedule. |
Scheduling | The human process of generating a schedule. |
Setup | |
Agents | Agents execute the scheduling logic into an ordered list of schedule transactions. |
Calendar | A table of schedule inputs (crushers, fleets, inventories, constraints, specifications) by time period. |
Constraints | Limits on movement by period, source, destination, material and agent. |
Dependencies | Dependencies prevent a block being mined before its nominated predecessors. |
Fleet Assignments | A list of permissible truck/loader combinations assigned to user-defined mining areas, such as Manned/Autonomous or Production/Rehandle. |
Preschedule | Blocks that are mined or partially mined before the starting point of the schedule. |
Product Specifications | Specify grade targets and limits for materials at source, in stockpiles, at crushers, railed or shipped. |
Steps | The components of fleet movement required to transport material from point A to point B; used to model rehandle and mixed fleets. |
Data | |
Table | A database of 3D scheduling blocks and inventories. Contains a block tree and associated reserves. |
Level | The table's block hierarchy, ie. Mine\Pit\Stage\Bench. |
Phase | A volume of dirt in one location that is mined in one or more benches. |
Bench | A volume of dirt at one elevation that is blasted in one or more blasts. |
Blast | A volume of dirt that is blasted together. |
Dig Solid | A volume of dirt that is mined together. |
Flitch | Elevations of dig solids inside a blast. |
Parcel | A material type with properties such as volume, tonnes, grades, and moisture. |
Dry Tonnes | The weight of a given material, excluding moisture. |
Wet Tonnes | The weight of a given material, including moisture. |
Product Fields | Fields (such as grade) which have both an in situ value and a product value. |
Navigation | |
Viewport | Any 3D visualisation area. |
Tab | Tabbed working area. |
Panel | Interactive frame within a tab. |
Dialog | A new window that opens to enter information. |
Dropdown | A dropdown box that lets you choose from a list. |
Icon/Button | A button that can be pressed. |
Checkbox/Flag | A box that can be ticked on or off. |