PS Configuration Options
Toggle the features available in this project.
Toggle the features available in this project.
Rapid Reserver
Rapid Reserver creates the pits, benches, blast solids and mining reserves for scheduling.
Embed Rapid Reserver
Reserves are loaded directly into the project and can be edited without leaving the scheduler.
This consumes a Rapid Reserver license and requires a local copy of the Rapid Reserver project (as opposed to a master copy on the network).
Do Not Embed Rapid Reserver
Reserves are imported in the Data Sources step. Any changes to reserves require the user to revert to Rapid Reserver standalone.
If the project is to be passed onto someone that does not need to changes the reserves, Unembed Rapid Reserver. Then the Resmodel file is not required by the end user.
Save Results
Save Schedule Results
Saves results from schedule with the model. This means the schedule will not need to be re-run when re-opening the model, however this consumes large amounts of memory and disc space.
Do Not Save Schedule Results
Results are not saved with the model and schedules will need to be run each time the model is opened. This saves memory and disc space.