APS Production Mode Features
Choose what mine production activities to include in the project.
Choose what activities to schedule.
Caption | Planning Function |
Model drilling of holes not related to blasting? | Grade control delay. |
Model drilling of blast holes? | Production drilling. |
Model charging of blast holes? | Explosives loading. |
Model drilling of presplit holes? | Presplit drilling for wall control. |
Model charging of presplit holes? | Explosives loading of Presplit holes. (Does not create mineable stock) |
Model blasting? | Blasting delays. |
Model a generic activity that occurs before drilling commencing? | Pattern cleanup or wall scaling delays. |
Model a generic activity that occurs before mining commences? | Post blast delay. Levelling blast heave, prepping area for dig unit access. |
Import a schedule for spatial guidance? | Compare spatial production schedule conformance against plans from ATS or APS |
Import or specify non-spatial guidance? | Compare production schedule targets or metrics from other plans |
Import a product stream from another site for further processing in this model? | Adjust crusher feed to offset another site’s rail grades. |
The Feature Settings are for animation visualization only.