SC. Polygons

Set the bench template, block model, and enclosing surfaces for each polygon.

  • Polygons can be organized in a tree by using delimiters for levels, such as "Pit1/Stage1".

  • Details may be assigned to multiple polygons at once by multi-selecting with the <SHIFT> and <CTRL> keys.

  • Surfaces may be dragged and dropped from the Layers panel into the Surfaces rows.

Add a polygon for each reporting area in the mine

Populate the polygon details in the table on the right:

Options

Options

Bench Template

Choose the bench heights

Block Model

Choose the block model

Production Surfaces

Production Start

Survey surface from the opening date

Production End

Survey surface from the closing date

Schedule Surfaces

Schedule Start

Plan depletion surface from the opening date

Schedule End

Plan depletion surface from the closing date

Schedule Future

(Optional) Plan depletion surface for the next time period

The Schedule Future surface may be used to differentiate between "Over Dig" and "Out of Plan" material. See SC. Domain Mappings for more information.



Â