SC. Polygons
Set the bench template, block model, and enclosing surfaces for each polygon.
Polygons can be organized in a tree by using delimiters for levels, such as "Pit1/Stage1".
Details may be assigned to multiple polygons at once by multi-selecting with the <SHIFT> and <CTRL> keys.
Surfaces may be dragged and dropped from the Layers panel into the Surfaces rows.
Populate the polygon details in the table on the right:
Options | |
---|---|
Bench Template | Choose the bench heights |
Block Model | Choose the block model |
Production Surfaces | |
Production Start | Survey surface from the opening date |
Production End | Survey surface from the closing date |
Schedule Surfaces | |
Schedule Start | Plan depletion surface from the opening date |
Schedule End | Plan depletion surface from the closing date |
Schedule Future | (Optional) Plan depletion surface for the next time period |
The Schedule Future surface may be used to differentiate between "Over Dig" and "Out of Plan" material. See SC. Domain Mappings for more information.
Â