SC Settings

Set the units, features, and thresholds to use in the project.

Toggle the settings and values to control project behaviour.

Units

Units

Quick Set

Use the Quick Set dropdown to select Metric or Imperial units of measurement.

Options

Use Block Model

Toggle use of block models for reserving.

Generate Stage Plans

Optional feature to generate stage plans from scheduling blocks.

Grid Size (Reserving) (m)

Grid spacing to use in reserving calculations.

Grid Size (Solids) (m)

Grid spacing to use in 3D solid visualisation and export solids.

Minimum Height Threshold (m)

Set this value to discard trivial solids from being displayed.

Minimum Bench Volume (m3)

Set this value to discard trivial volumes from reporting.



Note

Please take note when reducing the Grid Size for Solids and Reserves that there is a trade-off in the calculation time. That is, smaller the value the longer the calculations will take. There are negligible gains to be made from reducing the Grid Size from 1 to 0.1 however, the processing time will increase significantly. The recommendation is to start with values of 5 & 5 and inspect the resultant values. If desired, reduce the Grid Size values and quantify the change in values and the time taken. From this information, you should be able to identify if any significant gains are made and if they are worth the time trade-off.