PS Maximum Benches
In the Maximum Benches step user can limit an activity occurring on a bench until the Nᵗʰ bench above has had that activity completely carried out. Example, you can’t drill the 500RL until all of the records in the 530RL have been completely drilled.
To set the Max Active Benches:
Select the relevant activity from the Activities table.
Expand the records tree to the required level of granularity.
Select record from the tree.
Set the number of the Maximum Active Benches.
Maximum Benches step overview
Setting the value for a parent node will result in all child nodes inheriting the same value.